Measure, understand, improve
Brew day timeline planner
Add planned phases to a 24-hour start time to make a realistic brew-day finish estimate.
BrewMyBeer Editorial Team · Sources checked 12 November 2026 · Calculated examples, not laboratory measurements. How we create content
Interactive tool
Calculate your batch
Change the example values. Inputs stay in your browser, and your last inputs are remembered here.
How it works
Finish time = start time + preparation and mash minutes + boil and clean-up minutes, on a 24-hour clock. Enter the start as decimal hours: 9.5 is 09:30.
If the total runs past midnight, the result says how many days later the brew day ends.
Worked example
Starting at 09:00 with 120 minutes of preparation and mash and 120 minutes of boil and clean-up gives 4.0 hours of planned work and a finish at 13:00.
Common mistakes
Leaving out heating time. Bringing strike water and wort to temperature can take longer than the mash or boil themselves.
Forgetting chilling. Cooling wort to pitching temperature depends on your chiller and the water temperature.
Planning without a buffer. Add time for cleaning, measuring and anything that goes wrong.
Tools and recipes for this guide
Before you use the result
- Include heating and chilling time.
- Enter the start in decimal hours.
- Add a buffer before anything that cannot wait.
A quick learning check
How do you enter a 07:45 start?
Try a craft decision game →Sources & further reading
These references explain the methods and limitations. The worked examples and learning questions on this page are BrewMyBeer calculations, not claims of hands-on testing.